Town of Green Mountain Falls fence permit
Do you need a fence permit in the Town of Green Mountain Falls? Yes. The Town of Green Mountain Falls requires a permit before you build a fence.
buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the Town of Green Mountain Falls (site plan, aerial photo and filled-in details) in a few minutes. Start with your address.
Quick facts
- Permit required
- Yes source
- How to apply
- Email source
Still being confirmed with Green Mountain Falls: What are the Green Mountain Falls fence height/setback limits (Section 16-707) and the fee?
How to file for a fence permit in the Town of Green Mountain Falls
Steps based on greenmountainfalls.colorado.gov — 2021 05 03 Fence Permit
- Meet with GMF staff with draft plans.
- Email the signed application and checklist materials to [email protected].
- Pay fees to the Town Clerk and get a receipt.
- Staff review takes two weeks (14 days) for complete applications.
- Call 811 before digging.
- Paying
- Fee to Town Clerk (see fee schedule on town website)
- Review time
- Two weeks (14 days)
Who to contact
Town Planner
- [email protected]
Contact from greenmountainfalls.colorado.gov — 2021 05 03 Fence Permit
What to submit
- Signed and dated application
- Letter of explanation (schedule, zoning, fence height, material, lattice/solid/open, traffic vision obstruction)
- Site plan with setbacks, driveways, roads, structures, waterways/floodplain (FEMA zone)
- ILC or survey
Other rules to know
- Meet with town staff and bring draft plans before submitting.
- Height limits and setbacks: Section 16-707 and Zoning provisions (Section 16) per the permit form; not read.
- Town straddles El Paso and Teller counties; main part assumed El Paso, not verified.
Before you dig
Call 811 before digging post holes so underground utility lines are marked. Find your lot corner markers and keep the fence on your side of the line. Find your lot corner markers and keep the fence on your side of the line. County parcel maps can be off by several feet; if you're not sure where the line is, a licensed land surveyor can stake it.
Frequently asked questions
Do I need a permit to build a fence in the Town of Green Mountain Falls, CO?
Yes. The Town of Green Mountain Falls requires a permit before you build a fence.
How do I apply for a fence permit in the Town of Green Mountain Falls?
Meet with GMF staff with draft plans. Email the signed application and checklist materials to [email protected]. Pay fees to the Town Clerk and get a receipt. Staff review takes two weeks (14 days) for complete applications. Call 811 before digging. buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the Town of Green Mountain Falls (site plan, aerial photo and filled-in details) in a few minutes.
Who do I contact about a fence permit in the Town of Green Mountain Falls?
Town Planner. email [email protected].
Sources
Summarized from the Town of Green Mountain Falls's own ordinances, forms and permit pages. Each link opens the original.
Work for the Town of Green Mountain Falls? Help us keep this right
If anything on this page is wrong or out of date, tell us and we'll fix it. Municipal staff reports are reviewed first. Please include a link to the current ordinance, form or fee schedule if you can.