Town of Redington Beach fence permit
Do you need a fence permit in the Town of Redington Beach? Not confirmed. Contact the Town of Redington Beach before you build; the rules below are what we found in the ordinance.
buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the Town of Redington Beach (site plan, aerial photo and filled-in details) in a few minutes. Start with your address.
Quick facts
- Permit required
- Not confirmed
- Side and rear yards
- Wing walls and screening walls (single-family side yards only): max 6 ft above grade source
- How to apply
- Call 727-397-5538
Still being confirmed with Redington Beach: What are the maximum fence heights in front, side and rear yards (Chapter 6, Article X)?
How to file for a fence permit in the Town of Redington Beach
- Fill out the permit application (and Owner Builder Affidavit if you are doing the work).
- Email the application and documents to [email protected] or bring them to Redington Shores Town Hall, 17425 Gulf Blvd.
- Pay at Town Hall or online once the portal is available.
- Schedule inspections with the Building Department (727-262-2218, 8:30 am-3 pm).
- Call Sunshine 811 at least two full business days before digging.
- Paying
- At Town Hall (portal payments: 3% card fee or $2 check fee)
- Inspections
- 727-262-2218, 8:30 am-3:00 pm
Who to contact
- Phone
- 727-397-5538
- [email protected]
- Address
- Redington Shores Town Hall, 17425 Gulf Blvd., Redington Shores, FL 33708
What to submit
- Permit application
- Owner Builder Affidavit if you do the work yourself
- Subcontractor form if applicable
Other rules to know
- Since June 17, 2024, all new Redington Beach permits are handled by the Town of Redington Shores Building Department.
- Screening walls: max 6 ft high and 12 ft long, one per lot; wing walls need a 3 ft full-height opening.
- Card payments through the portal add a 3% fee; checks add $2.
Before you dig
Call Sunshine 811 before digging post holes (dial 811 or file online at sunshine811.com) at least two full business days ahead. Find your lot corner markers and keep the fence on your side of the line. County parcel maps can be off by several feet; if you're not sure where the line is, a licensed land surveyor can stake it.
Frequently asked questions
Do I need a permit to build a fence in the Town of Redington Beach, FL?
Not confirmed. Contact the Town of Redington Beach before you build; the rules below are what we found in the ordinance.
How tall can a fence be in the Town of Redington Beach?
Side and rear yards: Wing walls and screening walls (single-family side yards only): max 6 ft above grade.
How do I apply for a fence permit in the Town of Redington Beach?
Fill out the permit application (and Owner Builder Affidavit if you are doing the work). Email the application and documents to [email protected] or bring them to Redington Shores Town Hall, 17425 Gulf Blvd. Pay at Town Hall or online once the portal is available. Schedule inspections with the Building Department (727-262-2218, 8:30 am-3 pm). Call Sunshine 811 at least two full business days before digging. buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the Town of Redington Beach (site plan, aerial photo and filled-in details) in a few minutes.
Who do I contact about a fence permit in the Town of Redington Beach?
Building Department. Phone 727-397-5538, email [email protected].
Sources
Summarized from the Town of Redington Beach's own ordinances, forms and permit pages. Each link opens the original.
Ordinance: Town Zoning Code Sec. 6 Wing walls and screening walls (fences: Chapter 6, Article X)
Work for the Town of Redington Beach? Help us keep this right
If anything on this page is wrong or out of date, tell us and we'll fix it. Municipal staff reports are reviewed first. Please include a link to the current ordinance, form or fee schedule if you can.