Independent guide. Not affiliated with any city, village, town or county.

permit.guide
Johnson County, Texas

City of Joshua fence permit

Do you need a fence permit in the City of Joshua? Yes. The City of Joshua requires a permit before you build a fence.

buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the City of Joshua (site plan, aerial photo and filled-in details) in a few minutes. Start with your address.

Quick facts

Permit required
Yes source
Side and rear yards
Privacy/security: 8 ft max source
Front (street) yard
Decorative fence: 4 ft max in front yard (2 ft in visibility triangle) source
Corner lots
2 ft max in visibility triangle source
Distance from lot line
Decorative fences may not encroach on rights-of-way, drainage or access easements, or floodways; solid surface no more than 30% for decorative fences. source
Not allowed
Barbed wire (limited exceptions); electric fences only in agricultural zoning, UL-approved and inside a non-electric enclosure. source
How to apply
Call 817-558-7356

Still being confirmed with Joshua: Where does the permit application get submitted (in person, mail, email) and what is the fence fee?

Plan your fence and build the applicationLook up your address, draw the fence on an aerial photo of your lot, and get a site plan and filled-in application.

How to file for a fence permit in the City of Joshua

Steps based on ecode360.com — Municipal code

  1. Complete the City building permit application (Fence is a project type).
  2. Attach a plot plan showing the enclosure, easements, setback lines and visibility triangles.
  3. Submit to Permits & Inspections, 105 S. Main St. (817-558-7356) and pay the City-set fee.
  4. Call 811 before digging.

Who to contact

Phone
817-558-7356
Address
Permits & Inspections, 105 S. Main St., Joshua, TX 76058

What to submit

  • Permit application
  • Plot plan showing enclosures, easements, setback lines and visibility triangles

Other rules to know

  • Repairing more than 50% of a nonconforming fence's surface area needs a permit.

Before you dig

Call 811 before digging post holes so underground utility lines are marked. Find your lot corner markers and keep the fence on your side of the line. Find your lot corner markers and keep the fence on your side of the line. County parcel maps can be off by several feet; if you're not sure where the line is, a licensed land surveyor can stake it.

Frequently asked questions

Do I need a permit to build a fence in the City of Joshua, TX?

Yes. The City of Joshua requires a permit before you build a fence. Repairing more than 50% of a nonconforming fence's surface area needs a permit.

How tall can a fence be in the City of Joshua?

Side and rear yards: Privacy/security: 8 ft max. Front (street) yard: Decorative fence: 4 ft max in front yard (2 ft in visibility triangle). Corner lots: 2 ft max in visibility triangle.

How close to the property line can I put a fence in the City of Joshua?

Decorative fences may not encroach on rights-of-way, drainage or access easements, or floodways; solid surface no more than 30% for decorative fences.

How do I apply for a fence permit in the City of Joshua?

Complete the City building permit application (Fence is a project type). Attach a plot plan showing the enclosure, easements, setback lines and visibility triangles. Submit to Permits & Inspections, 105 S. Main St. (817-558-7356) and pay the City-set fee. Call 811 before digging. buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the City of Joshua (site plan, aerial photo and filled-in details) in a few minutes.

Who do I contact about a fence permit in the City of Joshua?

Permits & Inspections. Phone 817-558-7356.

Sources

Summarized from the City of Joshua's own ordinances, forms and permit pages. Each link opens the original.

Ordinance: Code of Ordinances Article 3.05 Fences

  1. ecode360.com — Municipal code

Work for the City of Joshua? Help us keep this right

If anything on this page is wrong or out of date, tell us and we'll fix it. Municipal staff reports are reviewed first. Please include a link to the current ordinance, form or fee schedule if you can.