City of Mayville fence permit
Do you need a fence permit in the City of Mayville? Yes. The City of Mayville requires a permit before you build a fence.
buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the City of Mayville (site plan, aerial photo and filled-in details) in a few minutes. Start with your address.
Quick facts
- Permit required
- Yes
- Fee
- $50 + $25 Zoning
- Side and rear yards
- 6 feet
- Front (street) yard
- Four feet six inches
- Corner lots
- Within 10 feet of a driveway’s crossing of the street right-of-way, maximum 2 feet.
- Distance from lot line
- At least 3 feet from property lines and at least 1 foot from any street right-of-way.
- How to apply
Still being confirmed with Mayville: Is there a published fence-permit payment procedure? Is there a published review time for fence applications? Is an inspection required after a fence is installed?
How to file for a fence permit in the City of Mayville
Steps based on kunkelengineering.com — building inspection
- Complete the Wisconsin Uniform Building Permit Application.
- Prepare plans and a plot plan or survey; the inspector’s general checklist requests hard copies and PDFs.
- Email the application PDFs and supporting documents to [email protected].
- Obtain the permit before starting work.
- Call Diggers Hotline (811) at least 3 business days before digging.
- Permit good for
- 2 years; one 1-year extension is listed for $50.
Who to contact
- Phone
- 920-382-6202
- [email protected]
What to submit
- Wisconsin Uniform Building Permit Application
- Plans and plot plan or survey; inspector publishes a general hard-copy plus PDF checklist
- Owner cautionary statement when applicable
Other rules to know
- Kunkel’s municipality-specific instructions expressly allow PDFs by email and list fences as permit work. Its broader building checklist does not identify a fence-specific hard-copy waiver or inspection sequence.
- Fence provisions §§430-89–430-94. Height is preserved as written; no numeric conversion is supplied.
- Dog pens are a separate category: rear yard only, at least 20 feet from property lines.
Before you dig
Call Diggers Hotline at 811 (or file online at diggershotline.com) at least 3 business days before digging post holes. Find your lot corner markers and keep the fence on your side of the line. County parcel maps can be off by several feet; if you're not sure where the line is, a licensed land surveyor can stake it.
Frequently asked questions
Do I need a permit to build a fence in the City of Mayville, WI?
Yes. The City of Mayville requires a permit before you build a fence.
How tall can a fence be in the City of Mayville?
Side and rear yards: 6 feet. Front (street) yard: Four feet six inches. Corner lots: Within 10 feet of a driveway’s crossing of the street right-of-way, maximum 2 feet..
How close to the property line can I put a fence in the City of Mayville?
At least 3 feet from property lines and at least 1 foot from any street right-of-way.
How much is a fence permit in the City of Mayville?
$50 + $25 Zoning.
How do I apply for a fence permit in the City of Mayville?
Complete the Wisconsin Uniform Building Permit Application. Prepare plans and a plot plan or survey; the inspector’s general checklist requests hard copies and PDFs. Email the application PDFs and supporting documents to [email protected]. Obtain the permit before starting work. Call Diggers Hotline (811) at least 3 business days before digging. buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the City of Mayville (site plan, aerial photo and filled-in details) in a few minutes.
Who do I contact about a fence permit in the City of Mayville?
. Phone 920-382-6202, email [email protected].
Sources
Summarized from the City of Mayville's own ordinances, forms and permit pages. Each link opens the original.
Work for the City of Mayville? Help us keep this right
If anything on this page is wrong or out of date, tell us and we'll fix it. Municipal staff reports are reviewed first. Please include a link to the current ordinance, form or fee schedule if you can.