Town of Day fence permit

Do you need a fence permit in the Town of Day? Not confirmed. Contact the Town of Day before you build; the rules below are what we found in the ordinance.

buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the Town of Day (site plan, aerial photo and filled-in details) in a few minutes. Start with your address.

Quick facts

Permit required
Not confirmed
Side and rear yards
6 ft source
Front (street) yard
4 ft in yards abutting streets source
Corner lots
4 ft in yards abutting streets; visual clearance triangles at intersections apply (Sec. 3.11) source
Distance from lot line
Residential fences are permitted on the property lines in residential districts, but not closer than 2 ft to any public right-of-way. source
Good side faces
All fences shall be installed with the finished side facing the adjoining property. source
How to apply
Email, mail, in person source

Still being confirmed with Day: Does a residential fence need a Town of Day zoning permit, and what is the fee?

Plan your fence and build the applicationLook up your address, draw the fence on an aerial photo of your lot, and get a site plan and filled-in application you can send to Town of Day.

How to file for a fence permit in the Town of Day

Steps based on townofdaywi.gov — application zoning permit

  1. Email [email protected] to ask whether your fence needs a Town zoning permit.
  2. If it does, fill out the Town zoning permit application and attach a scaled site plan showing the fence and its distances from lot lines and the road.
  3. Email it to [email protected] or mail/deliver it to 122518 County Road C, Stratford, WI 54484.
  4. Call Diggers Hotline (811) at least 3 business days before digging.

Who to contact

Email
[email protected]
Address
Town of Day, 122518 County Road C, Stratford, WI 54484

Contact from townofdaywi.gov — application zoning permit

What to submit

  • Town zoning permit application
  • Site plan drawn to scale showing the project location, dimensions, setbacks and any well or septic system

Official application form or packet

Other rules to know

  • The Town of Day adopted its own Zoning Code (Ord. 2026-02, adopted March 18, 2026, effective April 1, 2026), administered by a Town Zoning Administrator.
  • The code's zoning permit section (4.05) does not list fences either as requiring a permit or as exempt; zoning permit applications must include a surveyed plat certified by a registered land surveyor or engineer plus a scaled drawing.
  • Security fences (non-residential districts only) may be up to 10 ft and must be an open type.
  • Fees are set by the Town Board in a fee schedule posted at Town Hall (Sec. 4.11).
  • Marathon County's town officials directory lists Kevin Breit as Building Inspector / Zoning Admin for this town with phone 715-396-1176 (other towns list him at 715-693-1176) and Clerk Rebecca Post, 715-650-7095 (town identified by the directory's alphabetical order).

Before you dig

Call Diggers Hotline at 811 (or file online at diggershotline.com) at least 3 business days before digging post holes. Find your lot corner markers and keep the fence on your side of the line. County parcel maps can be off by several feet; if you're not sure where the line is, a licensed land surveyor can stake it.

Frequently asked questions

Do I need a permit to build a fence in the Town of Day, WI?

Not confirmed. Contact the Town of Day before you build; the rules below are what we found in the ordinance.

How tall can a fence be in the Town of Day?

Side and rear yards: 6 ft. Front (street) yard: 4 ft in yards abutting streets. Corner lots: 4 ft in yards abutting streets; visual clearance triangles at intersections apply (Sec. 3.11).

How close to the property line can I put a fence in the Town of Day?

Residential fences are permitted on the property lines in residential districts, but not closer than 2 ft to any public right-of-way.

Which side of the fence has to face the neighbor in the Town of Day?

All fences shall be installed with the finished side facing the adjoining property.

How do I apply for a fence permit in the Town of Day?

Email [email protected] to ask whether your fence needs a Town zoning permit. If it does, fill out the Town zoning permit application and attach a scaled site plan showing the fence and its distances from lot lines and the road. Email it to [email protected] or mail/deliver it to 122518 County Road C, Stratford, WI 54484. Call Diggers Hotline (811) at least 3 business days before digging. buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the Town of Day (site plan, aerial photo and filled-in details) in a few minutes.

Who do I contact about a fence permit in the Town of Day?

Town of Day Zoning Administrator. email [email protected].

Sources

Summarized from the Town of Day's own ordinances, forms and permit pages. Each link opens the original.

Ordinance: Town of Day Zoning Code Sec. 3.07(3)(d) Fences (Ord. 2026-02)

  1. townofdaywi.gov — town of day zoning code final master copy clean
  2. townofdaywi.gov — application zoning permit
  3. marathoncounty.gov — towns

Work for the Town of Day? Help us keep this right

If anything on this page is wrong or out of date, tell us and we'll fix it. Municipal staff reports are reviewed first. Please include a link to the current ordinance, form or fee schedule if you can.