Independent guide. Not affiliated with any city, village, town or county.

permit.guide
Oklahoma County, Oklahoma

City of Bethany fence permit

Do you need a fence permit in the City of Bethany? Not confirmed. Contact the City of Bethany before you build; the rules below are what we found in the ordinance.

buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the City of Bethany (site plan, aerial photo and filled-in details) in a few minutes. Start with your address.

Quick facts

Permit required
Not confirmed
Fee
$35.00 (Master Fee Schedule FY 2027, Building Permits: Fences) source
How to apply
Call 405-789-6005

Still being confirmed with Bethany: What are Bethany's maximum fence heights and setbacks?

Plan your fence and build the applicationLook up your address, draw the fence on an aerial photo of your lot, and get a site plan and filled-in application.

How to file for a fence permit in the City of Bethany

  1. Complete the Fence Permit Application with a dimensioned drawing showing property lines and structures.
  2. Email it to [email protected], fax (405) 789-6093, or deliver to 6700 NW 36th St.
  3. Pay the permit fee per the Master Fee Schedule.
  4. Call 811 before digging.
Paying
$35.00 per fee schedule

Who to contact

Phone
405-789-6005
Email
[email protected]
Address
6700 NW 36th St., Bethany, OK 73008

What to submit

  • Fence Permit Application with site address or legal description, owner name and address, valuation
  • Dimensioned drawing showing property lines and structures
  • Two copies of plans if plans are submitted
  • Contractor information
  • Applicant signature

Other rules to know

  • Fence contractor license fee is $30.00 (separate).
  • A permit does not waive building codes, ordinances or restrictive covenants; staff cannot approve variances.

Before you dig

Call 811 before digging post holes so underground utility lines are marked. Find your lot corner markers and keep the fence on your side of the line. Find your lot corner markers and keep the fence on your side of the line. County parcel maps can be off by several feet; if you're not sure where the line is, a licensed land surveyor can stake it.

Frequently asked questions

Do I need a permit to build a fence in the City of Bethany, OK?

Not confirmed. Contact the City of Bethany before you build; the rules below are what we found in the ordinance.

How much is a fence permit in the City of Bethany?

$35.00 (Master Fee Schedule FY 2027, Building Permits: Fences).

How do I apply for a fence permit in the City of Bethany?

Complete the Fence Permit Application with a dimensioned drawing showing property lines and structures. Email it to [email protected], fax (405) 789-6093, or deliver to 6700 NW 36th St. Pay the permit fee per the Master Fee Schedule. Call 811 before digging. buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the City of Bethany (site plan, aerial photo and filled-in details) in a few minutes.

Who do I contact about a fence permit in the City of Bethany?

. Phone 405-789-6005, email [email protected].

Sources

Summarized from the City of Bethany's own ordinances, forms and permit pages. Each link opens the original.

  1. cityofbethany.org — Master Fee Schedule FY 2027

Work for the City of Bethany? Help us keep this right

If anything on this page is wrong or out of date, tell us and we'll fix it. Municipal staff reports are reviewed first. Please include a link to the current ordinance, form or fee schedule if you can.