City of Midwest City fence permit
Do you need a fence permit in the City of Midwest City? Yes. The City of Midwest City requires a permit before you build a fence.
buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the City of Midwest City (site plan, aerial photo and filled-in details) in a few minutes. Start with your address.
Quick facts
- Permit required
- Yes source
- Fee
- Per Fee Table in Section 9-47 source
- Side and rear yards
- 8 ft source
- Front (street) yard
- 4 ft max at front and side property lines (taller needs Board of Adjustment approval) source
- Distance from lot line
- Fence may not extend into the street right-of-way or sight triangle; may not impede surface drainage. source
- Not allowed
- Sheet metal, plastic, corrugated metal panels, plywood and stockade posts in single- and two-family districts; electrified or barbed-wire fences on lots under one acre. source
- How to apply
- Online portal, in person source
How to file for a fence permit in the City of Midwest City
Steps based on midwestcityok.org — Permits Inspections
- Get a permit from the City before building a residential fence.
- Apply through the CityWorks Public Access Portal or in person at Community Development, City Hall, 100 N Midwest Blvd.
- Residential permits are typically reviewed within 3 to 5 days.
- Call 811 before digging.
- Paying
- Fee Table, Section 9-47
- Review time
- Typically 3 to 5 days
Who to contact
Permits & Building Inspections Division
Community Development
- Phone
- 405-739-1211
- Hours
- Mon-Thu 7:30 am-5:30 pm; Fri 7:30 am-11:30 am
- Address
- 100 N Midwest Boulevard, Midwest City, OK 73110
Contact from midwestcityok.org — Permits Inspections
Other rules to know
- Sight-proof screening fences must be 6 to 8 ft tall (5.2.2(B)(1)).
Before you dig
Call 811 before digging post holes so underground utility lines are marked. Find your lot corner markers and keep the fence on your side of the line. Find your lot corner markers and keep the fence on your side of the line. County parcel maps can be off by several feet; if you're not sure where the line is, a licensed land surveyor can stake it.
Frequently asked questions
Do I need a permit to build a fence in the City of Midwest City, OK?
Yes. The City of Midwest City requires a permit before you build a fence.
How tall can a fence be in the City of Midwest City?
Side and rear yards: 8 ft. Front (street) yard: 4 ft max at front and side property lines (taller needs Board of Adjustment approval).
How close to the property line can I put a fence in the City of Midwest City?
Fence may not extend into the street right-of-way or sight triangle; may not impede surface drainage.
How much is a fence permit in the City of Midwest City?
Per Fee Table in Section 9-47.
How do I apply for a fence permit in the City of Midwest City?
Get a permit from the City before building a residential fence. Apply through the CityWorks Public Access Portal or in person at Community Development, City Hall, 100 N Midwest Blvd. Residential permits are typically reviewed within 3 to 5 days. Call 811 before digging. buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the City of Midwest City (site plan, aerial photo and filled-in details) in a few minutes.
Who do I contact about a fence permit in the City of Midwest City?
Permits & Building Inspections Division, Community Development. Phone 405-739-1211.
Sources
Summarized from the City of Midwest City's own ordinances, forms and permit pages. Each link opens the original.
Work for the City of Midwest City? Help us keep this right
If anything on this page is wrong or out of date, tell us and we'll fix it. Municipal staff reports are reviewed first. Please include a link to the current ordinance, form or fee schedule if you can.