Village of Lomira fence permit
Do you need a fence permit in the Village of Lomira? Yes. The Village of Lomira requires a permit before you build a fence.
buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the Village of Lomira (site plan, aerial photo and filled-in details) in a few minutes. Start with your address.
Quick facts
- Permit required
- Yes
- Fee
- $100.00
- Side and rear yards
- 6 feet
- Front (street) yard
- 4 feet
- Corner lots
- Corner lots have two front yards.
- Distance from lot line
- 2 feet from any property line.
- Good side faces
- Finished side faces outward.
- Not allowed
- Dangerous, electrically shocking and barbed-wire fences. Cyclone fencing requires a top rail.
- How to apply
Still being confirmed with Lomira: Is the required fence inspection a final inspection after installation? Must the fee be paid before the permit is issued? Is there a published review time for fence applications? Must the fee be paid before the permit is issued?
How to file for a fence permit in the Village of Lomira
Steps based on villageoflomira.gov — 4ca23a 3d0b96d7e30e418eb019c876b6302a53
- Complete the Wisconsin Uniform Building Permit Application in the Building Permit Application Packet.
- Prepare plans and a plot plan or survey showing the project location and setbacks.
- Email the application and relevant documents to [email protected], as directed on the current village page.
- Wait for the inspector to confirm fees and permission to begin; pay the $100 fence fee using the village’s building-permit payment option.
- Receive the permit before beginning; complete work within 6 months or apply for an extension.
- Arrange the required fence inspection with MSA; the code does not name its stage.
- Call Diggers Hotline (811) at least 3 business days before digging.
- Paying
- Inspector confirms fee; village links an online PAY BUILDING PERMIT FEE option at https://www.trafficpayment.com/InvoiceInfo.aspx?csdId=1328. Payment timing not explicit.
- Inspections
- Permanent fencing requires inspection (§135-184(b)(3)); coordinate with MSA, 608-617-5691. Stage not stated.
- Permit good for
- Complete work within 6 months or apply for an extension.
Who to contact
- Phone
- 608-617-5691
- [email protected]
What to submit
- Wisconsin Uniform Building Permit Application
- Fence plans and plot plan or survey
- Signed owner cautionary statement when applicable
Other rules to know
- Ordinance 360, §135-184(b)(3).
- Current page directs applications to [email protected]; packet instead lists [email protected]. Current page route retained; discrepancy noted.
- Payment destination is officially linked, but opening the processor returned a redirect loop.
Before you dig
Call Diggers Hotline at 811 (or file online at diggershotline.com) at least 3 business days before digging post holes. Find your lot corner markers and keep the fence on your side of the line. County parcel maps can be off by several feet; if you're not sure where the line is, a licensed land surveyor can stake it.
Frequently asked questions
Do I need a permit to build a fence in the Village of Lomira, WI?
Yes. The Village of Lomira requires a permit before you build a fence.
How tall can a fence be in the Village of Lomira?
Side and rear yards: 6 feet. Front (street) yard: 4 feet. Corner lots: Corner lots have two front yards..
How close to the property line can I put a fence in the Village of Lomira?
2 feet from any property line.
Which side of the fence has to face the neighbor in the Village of Lomira?
Finished side faces outward.
How much is a fence permit in the Village of Lomira?
$100.00.
How do I apply for a fence permit in the Village of Lomira?
Complete the Wisconsin Uniform Building Permit Application in the Building Permit Application Packet. Prepare plans and a plot plan or survey showing the project location and setbacks. Email the application and relevant documents to [email protected], as directed on the current village page. Wait for the inspector to confirm fees and permission to begin; pay the $100 fence fee using the village’s building-permit payment option. Receive the permit before beginning; complete work within 6 months or apply for an extension. buildit.dog can turn a fence drawn on an aerial photo of your lot into a complete permit application package for the Village of Lomira (site plan, aerial photo and filled-in details) in a few minutes.
Who do I contact about a fence permit in the Village of Lomira?
. Phone 608-617-5691, email [email protected].
Sources
Summarized from the Village of Lomira's own ordinances, forms and permit pages. Each link opens the original.
Work for the Village of Lomira? Help us keep this right
If anything on this page is wrong or out of date, tell us and we'll fix it. Municipal staff reports are reviewed first. Please include a link to the current ordinance, form or fee schedule if you can.